Week of 5/13/17 – 5/18/17

Construction schedules are subject to change due to utility, material, weather and equipment delays.

New Impacts & Activities

On Sunday, May 14, night work will take place at the 1300 West intersection.

2200 West is closed to through traffic at 7000 South until Friday, May 26.

Sewer crews are expected to begin working in the Redwood Road intersection at the end of the May. Anticipated impacts include lanes closures and access restrictions.

Ongoing Impacts & Activities

Work will continue on 7000 South at 1300 West as crews construct new storm drain and sewer lines. Traffic has been switched to the outside lanes.

Water line work is taking place on the south side of 7000 South between Redwood Road and 1300 West.

Crews will be working at the 7000 South and 1300 West intersection on Saturdays (weather dependent).

Recently, several pieces of construction equipment and materials were stolen from the work site. A $2,000 reward is being offered by Knife River Construction for information leading to the arrest of those individuals responsible and/or the recovery of the these items. Please call the West Jordan Police Department at 801-840-4000 if you have any information.

For your safety and the safety of construction crews,

please obey all construction signage and flag operators.

Project Overview

Beginning in early February and continuing through Fall 2017, the City of West Jordan will be upgrading storm drain, sewer, and water systems along 7000 South between 1300 West and 3200 West. Work will include removing and replacing pipelines, installing box culvert canal sections, removing and replacing old utility services, as well as milling and overlaying a new roadway surface. Work is expected to take place Monday-Saturday 7:00 a.m. – 7:00 p.m., with occasional night work. Traffic will be reduced to one lane in each direction in work zones throughout the life of the project. Left turns from 7000 South will also be restricted. Traffic congestion and delays are expected. Motorists, pedestrians and cyclists are encouraged to use alternate routes when possible.

When the project is complete, residents can expect improved utility service, improved roadway drainage, and a smoother, safer commute.